S o f t w a r e     f o r     a u t o m a t i c     c r e a t i o n     o f     m o d e l s     u s i n g     p a r a m e t r i c     d a t a

  Generic Model Creation 

Examples
ICDAS YouTube Channel   ICDAS GEN 2024.00R 



123456789_123456789_1123456789123456789_123456789_123456789_123456789_123456789_123456789_1123456789_ 123456789_123456789_123456789_123456789_123456

Examples



Model description



Input



BIM model



Analysis model



Subscription 

 

 

 

Welcome to examples of ICDAS Generic Model Creation (ICDAS GEN).


ICDAS GEN is the latest add-ins from ICDAS to automate infrastructural construction in Revit. Parametric inputs are entered in Excel in similar manner as for ICDAS Bridges, ICDAS Wind Turbine Foundations and ICDAS Buildings. ICDAS GEN is special developed in Revit as an increasing demands of BIM in infrastructural constructions.


Revit BIM model created from ICDAS GEN can be easily uploaded on InfraWorks cloud services where the bridge will occur simultaneously with digital roads, buildings and elevations in 3D aerial map, cf. BIM+GIS Integration.

 

ICDAS GEN creates almost any geometry of infrastructural constructions, incl. bridges and tunnels along any alignment cf. Model description.

 

 

BIM for Infrastructure provide many advantages for maintenance and asset management og existing bridges, tunnels and structures. In Denmark the government has ‘Strategy for Denmark's digital growth’ which include i.a. to transform existing 2D drawings to digital 3D BIM models, see e.g. conditions of bridges in Denmark at BIM Model.

123456789_123456789_1123456789123456789_123456789_123456789_123456789_123456789_123456789_123456789_ 123456789_123456789_123456789_123456789_1234567

 

  123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_1234567 
123456789_123456789_11234
123
Bridges



  

 

Bridge Double Curves Deck (RH, RV)

29-08-2018

 

Bridge Double Curves Deck (RH, RV) Automation

18-03-2019

123456789_123456789_11234123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456

123123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456 

 

  

 

Bridge Box 2 Voids Alignment Vertical Curved & Tangents

26-08-2018 

 

 

 

Viborgvej Bro21, baseret på Vejdirektoratet Udbud 28-08-2018

09-08-2018

123456789_123456789_11234123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456

123123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456 

 

  123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456789_1234567 
123456789_123456789_11234
123
Tunnels



  

Tunnel test 50+50+50m  

04-08-2018 

 

 

 

123456789_123456789_11234123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456

123123456789_123456789_123456789_123456789_123456789_123456789_123456789_123456

 

 

 

123456789_123456789_1123456789ICDAS  •  Hans Erik Nielsens Vej 3  •  DK-3650 Ølstykke  •   E-mail: th@icdas.dk   •  Tel.: +45 60 53 83 79  •  CVR no.: 34436169